Modern TIER III Data Center

StoreData are modern data centers with a highly reliable infrastructure.
We do care about every customer.

100% Uptime since 2010

Dedicated server
01
Power system
Power is supplied as per the standards of a special group of essential loads. Two independent power supply beams, each capable of withstanding full loads of the data center under the 2N back-up scheme. UPS based on Liebert NXA – N+1. DDG – FG Wilson.
02
Cold supply system
The cold supply system is based on the N + 1 scheme, using HiRef TADR and Stulz CyberAir3 precision air conditioners. The climatic parameters and air purification degree comply with the ASHRAE recommendations, ensuring the durability of the equipment accommodated in the data center premises.
03
Fire system
The data centers are equipped with the facilities that provide a high level of fire safety. Fire and smoke alarm and early detection systems allow avoiding an emergency before the fire develops.
04
Safety system
Integrated security systems and strict adherence to data center access procedures ensure that the equipment is effectively protected. The data centers maintain CCTV systems storing footages for up to 120 days, use access cards. Duty shifts are monitored, security guards are at watch around the clock. Security systems comply with the PCI DSS standard.
StoreData offers guaranteed technical support 24/7/365
  • Equipment startup/shutdown/reboot
  • Indication check
  • Checking and switching connection lines
  • USB connections
  • IP KVM connection, up to five hours per month (in aggregate)
  • Response time: 15 to 20 minutes
Free
  • All operations under the Start Plan
  • Hot-swapping of HDD / power supplies: up to 10 replacements per month (subject to the provision of disks/adapters/power supplies) as per the customer’s SOW
  • Hot-swapping of power supplies: up to 5 replacements per month (subject to the provision of power supplies)
  • KVM connection, up to 24 hours per month (in aggregate)
5000
  • All operations under the Start Plan
  • Hot swapping of HDD / power supplies: up to 20 replacements per month (subject to the provision of disks/adapters/power supplies) as per the customer’s SOW
  • Replacing components that require opening the server (RAM, processors, power supplies, HDD, etc.) as per the customer’s SOW: up to 5 replacements per months
  • Burning discs, disc images (provided the link to the desired image is available)
  • Providing an individual IP KVM without limitations
  • Providing an individual storage cell for spare parts
  • Equipment installation in / removal from racks (up to 5 units per months)
  • Switching of the equipment in racks, with cables and connection cards provided by the customer
  • Re-crimping of UTP cables if damaged
9000
  • All operations under the Optimal Plan
  • Replacing components that require opening the server (RAM, processors, power supplies, HDD, etc.) as per the customer’s SOW
  • Installing the OS as per the customer’s SOW (provided that a link to the required image is available)
  • Configuring BIOS as per the customer’s SOW
  • Configuring network devices as per the customer’s SOW
  • Configuring web API as per the customer’s SOW
12000
Наша команда
Anton Platonov
Executive Director
Graduate in computer engineering, complexes, systems and networks, Department of Automation and Computer Engineering, MIEM HSE University. He has more than 10 years of experience in construction, operation, sales, management in the field of data centers. Professional achievements include organizing the company's workflow from scratch, successful experience in implementing large-scale IT projects, arranging the construction of three commercial data centers with a total area of about 1,500 sq m.
Alexander Kuznetsov
CTO
Graduate of the Master's Program, Department of Micro-, Opto-, and Nanoelectronics, Lomonosov Moscow State Institute of Fine Chemical Technologies. He is adept at data center construction, design, and operation. As a company's executive, he is in charge of coordinating the full cycle of work on the construction and operation of the engineering infrastructure, managing the hosted operations, developing and implementing regulations and rules for the data center's operations department.
Oleg Kiselev
Chief engineer
Graduate in electricity supply systems, Electrical Engineering Department, Ulyanov Chuvash State University. He has experience in design, construction and operation of large-scale Tier III data centers. As a company's executive, he is in charge of power equipment construction and operation.
StoreData's memories
Visit us
* - Required fields